EP- and EPC Plants with ideal Process

OPTIMAL IMPLEMENTATION TIME FOR EP AND EPC PLANTS: A PRIME EXAMPLE OF EFFICIENT PROCESSES

Since 1925, Christian Pfeiffer has been at the forefront of developing high-quality system components for grinding plants. In the early 1990s, our loyal customers encouraged us to leverage our extensive experience and innovative mindset in the field of engineering.

Today, we take an even more proactive role by serving as a supplier of customized EP (Engineering, Procurement) and EPC (Engineering, Procurement, Construction) plants. Upon request, we meticulously design and construct plants that precisely align with on-site requirements. Our unwavering focus remains on achieving exceptionally low total cost of ownership, coupled with cutting-edge technology and the reliable availability of components developed in Europe.

COMPETENT PLANT DESIGN
BY PROCESS EXPERTS
STRAIGHTFORWARD AND SPEEDY
PROJECT EXECUTION
MOST ENERGY-EFFICIENT PLANT
CUSTOMIZED FOR YOU

EP Projects: Complete Plants

At Christian Pfeiffer, we gladly assume responsibility for the entire planning (engineering) and supply (procurement) of complete grinding plants. Additionally, we offer the option of providing support during the realization of the project. Our engineers immerse themselves in the local requirements and production conditions. If desired, a dedicated project team can accompany the entire development phase of the grinding plant, from initial engineering through to production startup. The finished plant is then prepared for immediate and controlled operation.

EPC Projects: Turnkey Plants with Full Infrastructure

EPC stands for Engineering, Procurement, and Construction, and that’s precisely what you can rely on when you commission Christian Pfeiffer to build a turnkey plant. Our dedicated project team takes charge from initial planning through material delivery, machine setup, and production startup. Beyond planning and constructing the actual grinding plant, Christian Pfeiffer also handles the construction of peripherals (such as cement silos or packing plant buildings) and on-site civil works. From the foundation to the fully functional finished grinding plant, we ensure efficiency and reliability.

Successful project completion EP Project Cementos Inka

  • Egypt: EPC project in record time

    Efficiency defined: errection of new two-circuit coal grinding plant in only thirteen months for the Amreyah Cement Company.
    Cement
    Solid fuels
    Projects
    References
  • Christian Pfeiffer supplies a new complete plant to Spenner in Erwitte, Germany

    For the building materials manufacturer Spenner in Westphalia, Christian Pfeiffer is setting up a complete grinding plant for the production of cement
    Cement
    Projects
    News
    References
  • Christian Pfeiffer turnkey project in Malaysia increases production capacity by almost 60%

    In May 2016, Christian Pfeiffer successfully handed over the turnkey cement grinding plant in Malaysia to Cahya Mata Sarawak (CMS).
    Cement
    Projects
  • “We're super grateful for your feedback! It keeps us on our toes, making sure we're always giving you the best service possible. Together, we make awesome success stories happen, and we're pumped to be a part of your journey. For instance, we were thrilled to receive the following testimonial: 'Our vision is to be fulfilled through the continuous improvement of processes and the support of our customers and suppliers. […] Christian Pfeiffer demonstrated great flexibility and proved to be a reliable partner in all matters.' Thank you very much for the professional partnerships you build with us."

    Francisco Canepa
    Head of Sales

Get your 360°Mill Check now!

The elimination of bottlenecks can lead to significant energy savings. 

Let's find your bottlenecks.

Millcheck Batch
  • Process optimized mills durable, robust and efficient.

  • High quality Diaphragms

    for the optimal equipment of your ball mill

  • Complementary products

    for your process

  • Shell linings with innovative shape 

    for dynamic grinding processes.

Competence Center

Precise analysis for the perfect result.

We analyse your product to design the most efficient grinding plant.

  • Technology center for material tests 
  • Laboratory for material analysis
Christian Pfeiffer pilot plant
Our service

AT YOUR SITE. WITH SERVICE EXCELLENCE FOR NEW AND EXISTING PLANTS.

A story of efficiency

Efficiency in grinding is our heritage and our future.
Since 1925.

Making grinding processes as efficient as possible is a science in itself – one to which we dedicate our entire expertise and spirit of innovation. From the invention of the first MONOBLOC diaphragm to the technical fine-tuning of the separator QDK. How we became what we are today.